A Clinic in Bashkiria Built Using Construction Technologies of Chinese Wuhan and Moscow

01/06/2020 19:43

On May 30, a new Clinical and Diagnostic Infection Center was opened in the Ufa district. It is located on the territory of the Zubovo Industrial Park and is for patients with a new coronavirus infection.

The opening ceremony was attended by the Minister of Health of the Russian Federation Mikhail Murashko, Head of Bashkortostan Radiy Khabirov, First Deputy Prime Minister of the Republic of Bashkortostan - Head of the Representative office of the Eurasian Peoples’ Assembly in the Republic of Bashkortostan Andrey Nazarov, Chairman of the Federal Compulsory Medical Insurance Fund Elena Chernyakova.

The new hospital is a one-story modular structures complex constructed in the form of an inflorescence of kurai inflorescence with a total area of 16 thousand square meters. m. It includes 100 hospital boxes, including 82 boxes of round-the-clock stay and 18 resuscitation. It includes diagnostic, disinfection, laboratory, pharmacy and central sterilization departments, as well as a hostel for doctors. In case of full capacity, the center is ready to take 470 people.

The facility was built in record time - less than two months. Builders and designers relied on the most modern technologies, which, in particular, were used in China's Wuhan and Moscow. Most of the materials used for construction are made by Bashkortostan manufacturers. All communications at the complex are placed above the ceiling to serve them without contacting the center's doctors and patients. The shape of the kurai inflorescence reduced the length of the “clean” corridors of the facade. Thanks to this, doctors and patients will be able to get to the necessary premises faster.

The complex is equipped with the most modern equipment that will allow providing medical care at the highest level.

At the opening ceremony, Mikhail Murashko and Radiy Khabirov presented State Awards to doctors, builders of the Infectious Diseases Center and those who took the most active part in its construction.

“The developers and performers of the project set a very high bar - both in terms of quality and in terms of construction time. In Russia, such facilities have not yet been built in such a record time, I think. And I am sure there are not many of them in the world,” -  commented Andrey Nazarov, First Deputy Prime Minister of the Government of the Republic of Bashkortostan and Head of the Representative office of the Eurasian Peoples’ Assembly in the Republic of Bashkortostan.